Infrastructure development including under ground utilities like sewer, storm, irrigation, potable, telecommunication , electrical works and Road works for a scope of 38KM
Infrastructure development for city center (approx. 330 Hectares and 23 KM internal roads) Major scope includes the Earthworks , Demolition works , road work , Chilled water, all other underground utilities networks and Landscaping work.
Construction of a 1.4 KM flyover in Yanbu Al Sinaiyah Includes 1.2 km roadwork with two lanes of 3.75 m each.
Construction of infra networks in different length like Irrigation 74 KM, instrumentation 124.6 KM, Electrical 11.7 KM, Portable water and fire 5.7 KM, Sanitary system 2.78 KM and Storm 2.15 KM with Shoreline and Landscaping work of 420,000 Sqm.
Construction of Facilities and infrastructure to support MH-60R Aircraft
Construction of 17 Nos of Steel Reservoir tank , 170,000 Cum Storage Capacity each including 4.87 Million rock excavation.